A TENYU wind-generated electricity device float is off
TENYU Maizuru transference
TENYU Maizuru transference
TENYU Maizuru transference
TENYU Kagoshima
TENYU roll-on/fork on explanation
Roll on/off construction method
I load freight of up to 2,500 tons and take it down and, using a lamp of 21.7m in width that I made aft, can do it.
Fork on/off method
I draw the container crane of the 30m span for self-respect of 1,450 tons on the rail which I established on the mast deck and, using a fork and an outrigger established aft, can load it.
,0,0,0,0,0,0
Float on/off method
I can load the floating bodies such as 90m in length, 21.5m in width, the ships such as workboats of draft 4.5m, the submergence box in a half diving state.