Move to the text

The marine transportation construction results

The marine transportation results

Special freight transports a great variety of freight in various ship classes and methods of construction large freight.

TENYU Maizuru transference
TENYU Maizuru transference
TENYU Oi Wharf, Shinagawa Wharf
TENYU Oi Wharf, Shinagawa Wharf
TENZAN Vietnam
TENZAN Vietnam
TENMA Indonesia
TENMA Indonesia
TENSHO Mukaijima dock
TENSHO Mukaijima dock
TENMA Indonesia
TENMA Indonesia
TENYU Nagoyako
TENYU Nagoyako
TENKOU bridge construction
TENKOU bridge construction
TENBA Nagoya
TENBA Nagoya

Spare work with container crane by the TENYU

TENYU roll-on/fork on explanation

Roll on/off method of construction

I load freight of up to 2,500 tons and take it down and, using a lamp of 21.7m in width that I made aft, can do it.

Fork on/off method of construction

I draw the container crane of the 30m span for self-respect of 1,450 tons on the rail which I established on the mast deck and, using a fork and an outrigger established aft, can load it.

Float on/off method of construction

I can load the floating bodies such as 90m in length, 21.5m in width, the ships such as workboats of draft 4.5m, the submergence box in a half diving state.

Back to TOP